Oasis at Surfside Phase 2

Documents

Architectural

002221_Arch_2021.11.17

 

Civil

SP21-0073 APPROVED SDP Civil Drawings

 

V1-Photometric Plans

 

V1-Trash Compactor

 

V2 – SP21-0073 – Comments and Responses

 

V2-Elevations

 

SP21-0073 APPROVED SDP Landsacpe Drawings

 

V2-Site Development Plans

 

Structural

2_OASIS APTII_STRUC_CD SIGNED

 

MEP

MEP Download Package

 

LowVoltage

11.15.21 Low Voltage 100 Percent Construction Documents

 

Zimmer – Oasis – 27 00 00 Communications – 11 15 21 R0

 

Zimmer – Oasis – 27 10 00 Structured Cabling – 11 15 21 R0

 

Zimmer – Oasis – 27 13 00 Communications Backbone Cabling – 11 15 21 R0

 

Zimmer – Oasis – 27 41 00 Audio-Video Systems – 11 15 21 R0

 

Zimmer – Oasis – 28 13 00 Access Control- 11 15 21 R0

 

Zimmer – Oasis – 28 23 00 Video Surveillance – 11 15 21 R0

 

EnergyModeling

PLAN OAS- BT1-A – Energy and Input 11-17-21-s

 

PLAN OAS- BT1-B – Energy and Input 11-17-21-s

 

PLAN OAS- BT1-C – Energy and Input 11-17-21-s

 

PLAN OAS- Fitness Bld Energy an Input 11-16-21-s

 

PLAN OAS- Maint Bld Energy an Input 11-17-21-s

 

Geotechnical

Geo Report – Surfside Corner 18-225

 

Soil Testing Report – Surfside Corner

 

Environmental

18-8082.00 Surfside Corner, ESA Phase 1 Report ALL

 

Survey

2021.10.07 Oasis at Surfside ASB ATLA Survey V2

 

Metes & Bounds

2021.11.08 CC-U92-5916 E ES

 

2021.11.08 CC-U92-5916 W ES

 

Fitness Plan

Oasis at Surfside_Cape Coral_FL_2.02

 

RFI Log

Phase 1-Surfside-Revisions_Alterations_Suggestions_Obstacles

 

RFI’s Resulting in Revisions-Alternates

 

Unit Finish Schedule

Eagle Landing – Finishes Spreadsheet ZDC

 

Clubhouse

CAPE CORAL CLUBHOUSE (003)